Borumba will be capable of dispatching 2 000 MW and of storing up to 24 hours of energy. The existing lower reservoir (Lake Borumba) will be expanded with a new dam wall downstream from the ...
He said the dam wall failure assessment for the Borumba Pumped Hydro proposal was completed in 2022 but had not been made public. "You would think that's important information that people would ...
The plan will run lines from the site of the proposed Borumba Dam pumped hydro plant in the Mary Valley to substations at Woolooga, about 35km west of Gympie, and Halys in the South Burnett.